The old pool coping needs to be removed, and new pool coping needs to be replaced ready to have the rest of the pool area concreted. I'm needing the work done asap so end of September if possible. I have attached the coping tile I'm wanting to give an idea. And the trades person needs to have liability insurance as per my insurer requirements
#1 | Tradie 1 |
|
180 jobs | No longer in contact |
#2 | Tradie 2 |
|
1 job | No longer in contact |
#3 | Tradie 3 |
|
116 jobs | No longer in contact |
#4 | Tradie 4 |
|
155 jobs | No longer in contact |
#5 | Tradie 5 |
|
9 jobs | No longer in contact |
Partner with Builderscrack
Get work