Replace the 3 wall support brackets for the pool heater flue system on the outside of the building. Note highest bracket is 5.5m from base. The base is a large flat membrane roof approx 3m off ground. Flue is approx. 300mm dia but should check this dimension on site. Job involves removing the old clamp brackets off the flue, however leaving the actual bracket that is currently fixed to the wall as they are behind the flue pipe and out of sight. Replace the brackets with new galvanised with aluminium stays out from each side and dyna bolted to the concrete wall and paint (paint and brush will be supplied). Ref photo attached.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
4.0
|
Excellent experience. Were able to abseil where everyone else required scaffolding. Recommended highly.