I would like to have constructed a 5m long by 500mm high stone wall as in the photo attached. I have the stone from paving I had and have previously pulled out. There will need to be a concrete retaining wall to be built underneath before the wall is created either by you, or by a builder on your needs. This work will be undertaken at the same time as a perimeter wooden fence will be built in approximately 6 to 8 weeks time, but we would like to plan what is needed now.
#1 | Tradie 1 |
|
13 jobs | No longer in contact |
#2 | Tradie 2 |
|
33 jobs | No longer in contact |
Partner with Builderscrack
Get work