Published: 18 September 2022
Old timber balustrade to be removed and replaced with new code compliant balustrade on top of walkway behind second story units.
#1 | Tradie 1 |
|
80 jobs | No longer in contact |
#2 | Tradie 2 |
|
10 jobs | No longer in contact |
#3 | Tradie 3 |
|
162 jobs | No longer in contact |
#4 | Tradie 4 |
|
60 jobs | No longer in contact |
#5 | Tradie 5 |
|
45 jobs | No longer in contact |
Partner with Builderscrack
Get work