All the materials have been taken down apart from the rails, brackets and other hardware. New installation hardware is required to install the system to a concrete tile roof (the system was installed on a metal roof before). The new address is two levels with enough north facing area for the installation of this 5kw system. Job begins aroun late October or early November.
#1 | Tradie 1 |
|
136 jobs | No longer in contact |
#2 | Tradie 2 |
|
19 jobs | No longer in contact |
Partner with Builderscrack
Get work