We need a home handyman or builder to concrete in 3 large 8x4 posts and attach two 8x4 beams. I have concreted in the first post, but don't have enough free time to finish the rest. The plastic tunnel house will be removed before you start the work. The remaining posts, beams and bolts are supplied. Posts need to be in ground by 600mm. You need to supply the concrete. The posts must be vertical and beams horizontal.
#1 | Tradie 1 | No recent reviews | 2 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 0 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 4 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 31 jobs | No longer in contact |
#5 | Tradie 5 | No recent reviews | 14 jobs | No longer in contact |
Partner with Builderscrack
Get work