Hello there, Looking to have a small shed put together and installed. The foundation and base will also need to be done in the current vege plot as per photo. We can dig up the soil. Could I please have a rough estimate to do this and also a timeframe. Please do let me know if you need anymore info. Thank you.
#1 | Tradie 1 |
|
12 jobs | In contact |
#2 | Tradie 2 |
|
246 jobs | No longer in contact |
#3 | Tradie 3 |
|
75 jobs | No longer in contact |
#4 | Tradie 4 |
|
82 jobs | No longer in contact |
#5 | Tradie 5 |
|
20 jobs | No longer in contact |
#6 | Tradie 6 |
|
6 jobs | No longer in contact |
#7 | Tradie 7 |
|
111 jobs | No longer in contact |
#8 | Tradie 8 |
|
53 jobs | No longer in contact |
Partner with Builderscrack
Get work