Put together a shed and lay a wooden floor for it. Would also have to take or cut down the clothesline pole so it fits. Shed would need to be at least 2m wide. The gap from the fence to the house is 2.9m. I want this done ASAP if poss.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Todd was very efficient and on the ball with his communication. He finished his work to a high standard and I would use him again any day. Cheers Todd
Work carried out by the owner/operator
Reviewed on 20-05-2021
Tradesperson reply
"Thanks for the review mate"
Partner with Builderscrack
Get work