Installation to take 2 days. Scaffolding only to install DG on 4 windows second level of the house: 1 triangle-shaped located in front, 1 back (middle, half blinds open) and 2 more back right looking at neighbours' -see pics. Installation aprox by next January.
#1 | Tradie 1 |
|
8 jobs | No longer in contact |
Partner with Builderscrack
Get work