Posted 8 years ago
Scaffolding
Scaffolding
St. Albans, Christchurch
Scaffolding 2 free standing residential units, both units have a ground and first floor.
I expect the scaffold to be up for a min of 3 months. The ground floor frames are up, the first floor frames are waiting, roof, windows, cladding etc all to be completed from the scaffold.
- Max working height required: 6.6m (ground to roof ridge)
- 50 meters approx required for both units.
- I've attached a image with a highlighted area of scaffold required.
This job is ready to go now, for scaff...