Posted 7 years ago
Scaffolding for Bungalow Reno
Scaffolding
Mount Albert, Auckland
My house is getting extended so scaffolding is required on 3 sides for construction, roofing, and painting. The west/front side is the highest: 8m to roof apex, and 10m wide. The east/back is about 6m high at the apex and 10m wide. The north side will be about 23m long when extended and the eves hight ranges from 4.5 to 3.5 m. There are stairs and bay windows to navigate along this side too. Looking for indicative pricing.