We have our own scaffolding gear and need someone to erect/dismantle them. RC CON Scaffolding Requirements --- . All the scaffolding materials will be supplied by RC Con except #7. 2. TMP will be provided by RC CON. 3. Subcontractor will supply the documents and manpower regarding work involved with Kiwirail railroad. 4. Please give us your quote separately as erection/dismantle/inspection and each quote needs to be by square meter. 5. After erection and then dismantle, we’ll pay by square meter. 6. Partial erection/dismantle allowed when requested by RC CON. 7. Wall-to-floor anchor needs to be supplied/installed/dismantled by subcontractor. (material & manpower) 8. Whole material q’ty that is needed to be provided by subcontractor to RC Con before starting the job. 9. Installed area shall be calculated by where up to footpath boards are installed. 10. Dismantle shall include moving down the materials and putting them at the place where RC con assigned. 11. Installment shall be done by July 30th 2023, and dismantle should be done by Oct 30th, 2023.
#1 | Tradie 1 |
|
2 jobs | No longer in contact |
Partner with Builderscrack
Get work