Scaffold required for 90 degree corner bay windows to 2 levels. Level 2 platform is between 4.5 and 5.5m above ground level. 2.9 x 2.7 m in each direction from corner. Access from both sides of house. Need for approx 2 weeks ideally from late November. Site inspection recommended.
#1 | Tradie 1 |
|
19 jobs | No longer in contact |
#2 | Tradie 2 |
|
5 jobs | No longer in contact |
#3 | Tradie 3 |
|
3 jobs | No longer in contact |
Partner with Builderscrack
Get work