Front West side truss/scaffold over the pergola and conservatory and platform to repair/replace upper window Rear East side erect fixed scaffolding up over the rear stairs to allow replacement of upper window. Ticketed scaffolder, built to industry standards and tagged
#1 | Tradie 1 |
|
8 jobs | No longer in contact |
#2 | Tradie 2 |
|
1 job | No longer in contact |
#3 | Tradie 3 | No recent reviews | 0 jobs | No longer in contact |
#4 | Tradie 4 |
|
19 jobs | No longer in contact |
Partner with Builderscrack
Get work