I have two high sides of house to be scaffolded for painting. One needs 2 levels the top being 6.2 Metres high by 7 metres long. The 2nd side is sloping at 5.4 Metres high by 8 metres long. Need about 4 weeks.
#1 | Tradie 1 |
|
11 jobs | No longer in contact |
#2 | Tradie 2 |
|
10 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 0 jobs | No longer in contact |
Partner with Builderscrack
Get work