Quote needed before 22 May if possible, timeframe for completion of work negotiable. What is needed: high ceilings over kitchen and lounge has no insulation so want to explore how this can be insulated by removing roofing to access, checking and repair of any part showing wear, removal of nails replace with screws, removal of tv aerial, reseal around flue, replacing of end and side barge-boards (note difficulty around join to deck roof).
Workmanship |
4.0
|
Cost |
4.0
|
Schedule |
3.0
|
Communications |
5.0
|
Work carried out by the owner/operator
Reviewed on 10-08-2017
Partner with Builderscrack
Get work