Published on 6 March 2023
Gutters were originally installed by continuous spouting. Looking to: 1. Fix gutter along a shed line that's partially unhooked itself from the shed. 2. Get 2 new gutters for 2 bay windows and downpipes to connect with drainage system. 3. Extend open vent 600mm above gutter See photos of work required.
Workmanship |
5.0
|
Cost |
4.0
|
Schedule |
5.0
|
Communications |
5.0
|
It felt a little pricey but got the job done which is what I needed.
Work carried out by the owner/operator
Reviewed on 28 March 2023
Partner with Builderscrack
Get work