Centre ridge tiles and 1 row of tiles down were removed when the building was relocated To allow extra height clearance for power lines . Roof tiles needs to be reinstated and mortared to a point it can then be sprayed and painted . Looking to get this done as soon as possible . New tiles will be required , have some old spares but around 80 percent broke in the removal process .
#1 | Tradie 1 |
|
279 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 34 jobs | No longer in contact |
#3 | Tradie 3 |
|
453 jobs | No longer in contact |
#4 | Tradie 4 |
|
66 jobs | No longer in contact |
Partner with Builderscrack
Get work