I have to replace tile roof with long run steel. I have the steel and everything necessary for half the roof and need the other half done later. A person started the job then asked for folding. I refused. He was doing it on an hourly rate and quoted 3000 to complete the job. I want to pay by invoice he walked off the job. I really have no idea for time frame but it is expected to be completed in 3 days by 2 people is what I have been told by someone who is too busy to pick up job now. Would really love it completed before the next big storm please. Photos are front of house showing profile and side if house showing roof area to be replaced.
#1 | Tradie 1 |
|
16 jobs | No longer in contact |
#2 | Tradie 2 |
|
0 jobs | No longer in contact |
#3 | Tradie 3 |
|
2 jobs | No longer in contact |
#4 | Tradie 4 |
|
19 jobs | No longer in contact |
Partner with Builderscrack
Get work