new vertical spouting required. When rainfall is especially hard, the existing spouting at the other end is not sufficient. An L connector would be required at the bottom to link to approx 4 metres of horizontal spouting to reach the drain.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
great job, thoroughly recommend
Reviewed on 08-03-2023
Partner with Builderscrack
Get work