Disconnect and copper weld exit for existing copper downpipe. Re align approx 8m of spouting and install new PVC outlet to suit new PVC downpipe to new tank, Approx 8 m of new PVC Copper coloured 80mm downpipe required. Connect to tank , tank by owner. Please refer to concept scope in attached photos/sketch plan.
#1 | Tradie 1 |
|
26 jobs | No longer in contact |
#2 | Tradie 2 |
|
155 jobs | No longer in contact |
#3 | Tradie 3 |
|
9 jobs | No longer in contact |
Partner with Builderscrack
Get work