A 9m long garage needs front and back guttering repaired. Galvanized box gutter joints leak in several places and the spouts are both on the uphill end of the building. So in addition to sealing the leaking joints, the spouts need moved to the downhill end. It may be possible/ easiest to remove the gutters and rotate them (put the front gutter on the back and vice versa).
Partner with Builderscrack
Get work