Dry area of lead at front gable end that has split. Applied silicone for temporary repair. Need to replace apron flashing at front gable (about 4 meters), would require edge protection, a builder, possibly a plaster and painter and also for roof area to be removed to replace split lead.
#1 | Tradie 1 |
|
99 jobs | No longer in contact |
Partner with Builderscrack
Get work