Currently there are 3 runs of "plastic" roofing that need removing Building paper is needed where the plastic is removed and new corrugated iron needs to be installed. The length of Ron front the ridge to the gutter is 4.6 meters.
#1 | Tradie 1 |
|
127 jobs | No longer in contact |
#2 | Tradie 2 |
|
38 jobs | No longer in contact |
Partner with Builderscrack
Get work