Install flashing with lead skirt at change of angle of roof. This is for the back/side as the front has already been done. The tar paper will need replacing.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Ewird communicated well and carried out the job efficiently.
Work carried out by the owner/operator
Reviewed on 30-10-2023
Partner with Builderscrack
Get work