Remove all loose concrete, and leaking, damaged or cracked tiles. Replace 2 ridge cap. Re-pointing all ridges and hips. Repointing gable end. Tiles do not need to conform to a colour, tiles do not need painting at this stage.
Partner with Builderscrack
Get work