The job involves cutting out an approx 1M section of galvanised spouting , renewing the section and installing an additional downpipe - currently there is insufficient downpipe(s) to for all water to drain away. This would involve running an above ground pipe under the house to link with the sump at the rear. There is 1 - 2M underfloor clearance. We would like the job to be completed sometime in March 2023
Workmanship |
4.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
We were very satisfied with Steves installation of a new down pipe and subfloor diversion pipe under the house which connected to the sump at the rear well. There was however a complication with the installation of a new section of guttering above our front entrance This linked guttering with slightly different profiles and although the join at one end was satisfactory we were left with a mismatch at the other!
Work carried out by the owner/operator
Reviewed on 08-05-2023