Replacement of i.5 metre length of spouting. Slightly higher than one story however easily reached from a ladder.
Workmanship |
5.0
|
Cost |
4.0
|
Schedule |
5.0
|
Communications |
5.0
|
Work carried out by the owner/operator
Reviewed on 31-08-2022
Partner with Builderscrack
Get work