Roofer required to repair water run off going in wrong direction. Water is falling in the wrong direction so the new iron needs to be installed and lifted so the water falls correctly. Iron required is approx. 1660 x 1400mm, likely some ply or similar to raise it a few mm against the house.
#1 | Tradie 1 |
|
65 jobs | No longer in contact |
Partner with Builderscrack
Get work