About 3m length of concrete kerb is tilting away from asphalt drive leaving gap up to 40mm. The section of concrete block kerb needs lifting and resetting. All hand work would take a few hours on one day.
#1 | Tradie 1 |
|
64 jobs | No longer in contact |
#2 | Tradie 2 |
|
218 jobs | No longer in contact |
#3 | Tradie 3 |
|
6 jobs | No longer in contact |
#4 | Tradie 4 |
|
4 jobs | No longer in contact |
#5 | Tradie 5 |
|
44 jobs | No longer in contact |
#6 | Tradie 6 |
|
5 jobs | No longer in contact |
Partner with Builderscrack
Get work