To realign 4.2m long gutter which is short of the roofline and add section to divert water from existing downpipe. The gutter cannot manage during a downpour. The existing extension is not fit-for-purpose. To complete all jobs before this Christmas to a high standard. Please do not bid for the job unless you have the skills and can finish within the timeframe - before 25 December 2022.
Workmanship |
3.0
|
Cost |
1.0
|
Schedule |
1.0
|
Communications |
1.0
|
Lance Macdonald seldom answers his mobile. It diverts directly to his voicemail. Good luck getting a timely callback or response from him. He fraudulently gains financial advantage by deception when he takes a sizeable deposit and then fails to do the job. Avoid at all cost!
Work carried out by the owner/operator
Reviewed on 20-10-2023
Partner with Builderscrack
Get work