Take down 2 internal walls between current bathroom and toilet. Replace bath, vanity, shower, toilet, add heated towel rail, heater, lightin, mirror and accessories. Make good walls. Liaise with flooring contracttor and painter.
#1 | Tradie 1 |
|
1 job | No longer in contact |
#2 | Tradie 2 |
|
10 jobs | No longer in contact |
#3 | Tradie 3 |
|
4 jobs | No longer in contact |
#4 | Tradie 4 |
|
10 jobs | No longer in contact |
#5 | Tradie 5 |
|
1 job | No longer in contact |
#6 | Tradie 6 |
|
14 jobs | No longer in contact |
Partner with Builderscrack
Get work