1/ Raise floor level (circa 150mm) to match existing laundry floor level (approx 4m x 0.89m) 2/ Heighten 2 door frames (toilet and storage room) in non-structural brick walls 3/ Hang 2 new doors 4/ Line toilet walls to hide pipe and electrical 5/ Replace toilet 6/ New small handbasin and associated plumbing 7/ Obtain necessary Council compliance approvals / documentation.
Workmanship |
4.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
4.0
|
Good to deal with and happy with the job done.
Work carried out by the owner/operator
Reviewed on 20-04-2023
Tradesperson reply
"Thanks your review"
Partner with Builderscrack
Get work