In the ensuite bathroom, existing shower box needs replacing . Need tradie to check if the stellar twin --- will be suitable as a replacement. Main bathroom needs tiles behind vanity removed and replaced. waterproofing of wall behind vanity also needs to be done.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Marco and his mate did an excellent job. Marco showed us tile samples and communicated with us very well. He is also patient and changed the tiling when we changed our mind on the tile size after the initial tiling was done. He and his mate worked long hours to get the job finished on schedule. We are very happy with our new shower and tiled vanity, would highly recommend Wet Marble for your tiling and bathroom projects.
Work carried out by the owner/operator
Reviewed on 06-10-2022
Partner with Builderscrack
Get work