Review

Small bathroom renovation.

Job image

Job description

Bathroom Renovation
Wellington

Old shower replaced with new acrylic shower. Bath replaced. Hot water cylinder cupboard removed. We are also considering moving a non load bearing wall back and adding a toilet. Open to suggestions.


Review

Workmanship
2.0
Cost
4.0
Schedule
2.0
Communications
3.0

Barry is a nice but unfortunately we were disappointed with our bathroom reno. He always finished early, which meant my husband had to finish the sanding the walls himself, and the whole project took two weeks longer than expected minus Barry's personal delays. We wanted to get consent for the added toilet. Barry promised us that he would sort that but he didn't, now theres a pipe sticking out of our wall. The overall finish was very rough and some of the taps are backwards .

Work carried out by the owner/operator
Reviewed on 19-11-2020

Verified Builderscrack review