We have plans drafted for house renovation. The most significant change is moving stairs from the end of the house to the middle. One structural wall to be removed upstairs. New bathroom downstairs. Reconfiguration of other rooms upstairs including but not limited to kitchen and bathroom. Most other changes are putting in walls not removing. No additional floor area just reconfiguration.
#1 | Tradie 1 |
|
56 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 141 jobs | No longer in contact |
#3 | Tradie 3 |
|
13 jobs | No longer in contact |
#4 | Tradie 4 |
|
11 jobs | No longer in contact |
#5 | Tradie 5 |
|
25 jobs | No longer in contact |
#6 | Tradie 6 |
|
48 jobs | No longer in contact |
#7 | Tradie 7 | No recent reviews | 37 jobs | No longer in contact |
#8 | Tradie 8 |
|
10 jobs | No longer in contact |
Partner with Builderscrack
Get work