Bathroom jib has been removed and plumbing set up, including waste for a vanity and shower. Work required from builder includes. Wall brackets for Vanity. Floor repairs in two places, small section of bathroom, and also in the hot water cylinder cupboard. Rejibbing will also be required of the bathroom and toilet areas. There is also a wall section that may need to be built out. Best for a tradesman to have a look, provide us with an estimate for the work, then we can go from there.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Main job was to jib and plaster bathroom (as seen in photo). Awesome communication, the work/timeframe and quote were discussed, agreed and completed without any surprises, friendly and professional. I would recommend to others.
Work carried out by the owner/operator
Reviewed on 17-11-2016