- replace toilet with new one - re-do flooring in both toilet room and bathroom plus floor space in-between, with vinyl or tiles -replace gib behind toilet and wall to left of toilet -finish installing mixer and pipe input in shower (we already have those parts)
#1 | Tradie 1 |
|
269 jobs | In contact |
#2 | Tradie 2 |
|
141 jobs | No longer in contact |
#3 | Tradie 3 |
|
63 jobs | No longer in contact |
#4 | Tradie 4 |
|
156 jobs | No longer in contact |
#5 | Tradie 5 |
|
2 jobs | No longer in contact |
#6 | Tradie 6 |
|
38 jobs | No longer in contact |
#7 | Tradie 7 |
|
1 job | No longer in contact |
Partner with Builderscrack
Get work