Main bathroom (1.75x2.75m) with tiled shower cubicle, floor vanity with mirror above and bath under the window with all walls tiled. Leak from shower causing issues (not sure if originally waterproofed from 20yrs ago). Shower area & potentially most of back wall (or all walls) will need to be removed, waterproofed and new shower, vanity with mirror (& potentially bath) to be replaced with walls to be painted or tiled. Looking for this to happen in the next month or so.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Steve was great to work with on this project. He worked fast, kept the area very tidy while working and left the area spotless at the end of the day. Steve made great plan adjustments once the demo work was finished and we discovered what we had to work with, and everthing came well within budget. A fabulous job!
Work carried out by the owner/operator
Reviewed on 10-10-2023
Partner with Builderscrack
Get work