At the moment it’s a separate toilet and shower room so we would like the wall knocked down to make a bathroom. To have the shower replaced with a bath, and over bath shower, toilet and vanity with basin replaced, have the tiles taken off the walls (all walls are covered at the moment apart from shower wall) and floor tiles and panelling removed and then replaced with tiles around bath only. Walls made ready for us to paint. The bathroom is approx 5 m2 if the wall was knocked down. We would need this done october/November time
#1 | Tradie 1 |
|
445 jobs | No longer in contact |
#2 | Tradie 2 |
|
77 jobs | No longer in contact |
#3 | Tradie 3 |
|
54 jobs | No longer in contact |
#4 | Tradie 4 |
|
16 jobs | No longer in contact |
#5 | Tradie 5 |
|
73 jobs | No longer in contact |
#6 | Tradie 6 | No recent reviews | 0 jobs | No longer in contact |
#7 | Tradie 7 | No recent reviews | 20 jobs | No longer in contact |
#8 | Tradie 8 |
|
10 jobs | No longer in contact |
Partner with Builderscrack
Get work