1. Replace existing toilet bowl 2. Install sink/basin and mirror 3. Remove bathtub 4. Install shower enclosure 5. Install additional toilet bowl 6. Replace the existing sink/basin 7. Re-tile floors and walls 8. Repaint ceilings and walls 9. Timeframe = 15-20 days