Published on 15 November 2024
This job involves a reinstallation of an upstairs shower. A re-install of the shower floor water proofing , shower trim and laying the floor tiles. The shower has begun to leak so we have removed the old shower tiles.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Sam and his team did our bathroom waterproofing and tiling and they did such a great job! Sam is very professional, He is detail oriented, sticks to schedule, trustworthy and the final product was great. Highly recommended!
Work carried out by the owner/operator
Reviewed on 10 December 2024
Partner with Builderscrack
Get work