We have removed the wallpaper, basin and cabinet and other fixtures. The ceiling was cracked and peeling. I have tried to fill the holes in the gib, I should have left that to the experts! The shower and toilet need to be removed. The objective is to be able to paint the walls and ceiling, install a new shower, cabinetry, toilet and heated towel rails. The floor tiles will probably need replacing.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
These guys are amazing. Anything that needed a decision, they checked with me first before proceeding. Really great at tidying up at the end of each day. We now have a beautiful ensuite with new shower, vanity, toilet, mirror cabinet with light and two vertical towel rails. Top notch communication. Looking forward to getting them back for our main bathroom rescue.
Work carried out by the owner & subcontractors