We are having new flooring layed in two bathrooms and need the toilet and pedestal vanity lifted on or before 9th of January. Ideally staggered so we always have access to a functional toilet.
#1 | Tradie 1 |
|
19 jobs | No longer in contact |
#2 | Tradie 2 |
|
1 job | No longer in contact |
#3 | Tradie 3 |
|
111 jobs | No longer in contact |
#4 | Tradie 4 | Not reviewed | 0 jobs | No longer in contact |
#5 | Tradie 5 |
|
76 jobs | No longer in contact |
#6 | Tradie 6 |
|
12 jobs | No longer in contact |
Partner with Builderscrack
Get work