Published on 27 May 2023
Total renovation of two bathrooms. (One first and then the second so the house can still be live-able while the reno is going on.) Remove old and put all new fittings. Flooring vinyl and wall paint. 1. Shower, WC, Two sinks. Tub. 2. Shower, WC, Single sink.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Martin was the best trades professional I have come across. He has the highest quality of work ethic, excellent communicator, and completed the work as was contracted. I have no hesitation in scoring a perfect 5-star for his work and professionalism.
Work carried out by the owner/operator
Reviewed on 25 August 2023
Partner with Builderscrack
Get work