Ceiling needs to have texture removed and then painted. All Walls need wallpaper removed and then either painted or rewallpapered. All window edging needs re-painting. This is a brick house but there is some outside painting to be done. 3 Bedroom plus small office and garage. House to be done in April/May
#1 | Tradie 1 |
|
26 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 25 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 2 jobs | No longer in contact |
Partner with Builderscrack
Get work