7m ensuite bathroom, have replaced shower and need tiling done on the floor. Existing floor is vinyl planking so prob tiling over the top of that (tile & slate board), and possibly skirting tiles. As work has been done on shower availability is most important thing, as need to have job done in the next 2-3 weeks.
#1 | Tradie 1 | No recent reviews | 4 jobs | No longer in contact |
#2 | Tradie 2 |
|
16 jobs | No longer in contact |
#3 | Tradie 3 |
|
35 jobs | No longer in contact |
Partner with Builderscrack
Get work