Completely strip bathroom including all wall linings, straighten all walls and ceilings, re-move wall and door head to existing toilet. dump all rubbish. re-line walls and ceilings supply Plasterboard. Plumbing: Re- new all piping in the bathroom, new toilet waste, shower waste water fead ect. Install new vanity,toilet and shower. Electrical: Re-new wiring supply and install down lights and new extractor fan,lighting over vanity new switches. Plasterer: plaster all walls and ceiling square stop to level 4 finish.
#1 | Tradie 1 |
|
138 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 1 job | No longer in contact |
#3 | Tradie 3 | No recent reviews | 28 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 3 jobs | No longer in contact |
Partner with Builderscrack
Get work