New overhead cupboards, under bench drawers and cupboards and laminate bench top required. New sink required. White laminate cupboards with light grey benches (similar to flooring). Subway tiles on backsplash. New cubboard for washtub and new washtub required. New cupboard for hot water service to be built and fitted (not shown in photos). Old cupboards, benchtop and sink to be removed. Keep existing taps as recently replaced. Job to be completed in second/third week of January 2024 if possible. I live in Australia but my brother is in Timaru so he could liaise if necessary
#1 | Tradie 1 |
|
2 jobs | No longer in contact |
#2 | Tradie 2 |
|
5 jobs | No longer in contact |
Partner with Builderscrack
Get work