Active job

Interior Renovations

Job image
Job image
Job image
Job image

Job description

General Renovations
Timaru

Extensive interior renovation of 2-story 1910 Villa. Upstairs: Move bathroom and return current bathroom to bedroom, replace single glaze aluminium windows in bedroom with new double glazed timber windows; Construct WIR in two bedrooms, Install access hatch into hall ceiling. Downstairs: Create master-suite by joining two current bedrooms, remove downstairs bathroom and replace with guest WC, and laundry, remove current laundry, reconfiguration of lounge by adding new entrance doors and removing current doors, add period fireplace (non-working), remove lowered ceiling in kitchen and replace with raked ceiling. We would need the upstairs work to be completed first before the downstairs work.


Trade professionals

#1 Tradie 1
5 jobs No longer in contact
#2 Tradie 2
1 job No longer in contact
#3 Tradie 3 No recent reviews 3 jobs No longer in contact
#4 Tradie 4 Not reviewed 0 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo